Buying Guides

The Buying Guides Custom Brief That Survives CAD

The Buying Guides Custom Brief That Survives CAD
TECHNICAL NOTEPART 910146CANov 17, 20264 MIN READ
Scope

Most buyers open a buying guides category on a price filter and close it on a spec they cannot verify.

01Most custom briefs die in the first render

Most custom briefs die in the first render

A brief that says the design should feel delicate gives the CAD team nothing to measure. The range holds 4460 designs in this category.

A brief that survives has numbers, priorities, and one named reference per dimension.

925 sterling silver carries 99% of the designs, which is why a metal change is a scheduling question and not a design question.

The metal split is narrow on purpose: 925 sterling silver at 99% keeps the quote cycle short for most reorders.

02What the brief has to pin down

What the brief has to pin down

ItemWhat to specifyWhy it matters
Base metal925 sterling silver or an alternativeSets the budget and the finish path
Stonelab grown diamond, size and countDrives the setting and the price
ProportionsShank width, setting height in mmThe two numbers that decide comfort
Size rangeSmallest and largest to be quotedAvoids a re-quote after approval

Lab grown diamond is the dominant stone at 66%; moissanite makes up 33%. Round cuts lead at 67%, followed by classic at 16%.

The figure of 4460 is worth reconciling against your own shortlist before the quote, because it sets how much of the buy can be stock.

03Priorities, not adjectives

Priorities, not adjectives

Rank three things and say which one gives way if the render cannot hold all of them: stone security, setting height, or shank weight. A brief without a priority list gets a render that satisfies none of them.

Reference designs in the range include Round Bezel Moissanite Engagement Ring; Square Bezel Moissanite Engagement Ring; Round Bezel Moissanite Engagement Ring.

lab grown diamond accounts for 66% of the designs, so stone sourcing is already settled for most of the range.

04The approval loop

The approval loop

  • Approve the wireframe before the render
  • Check stone seating in the render, not the hero angle
  • Confirm dimensions in millimetres on the drawing
  • Sign off the metal and finish on a physical sample

Each step is cheaper than the one after it, which is why the order matters.

With 4460 designs on file, the reorder path usually exists before the first order is placed.

Round at 67% is the cut a photographer can light consistently, which shortens the time from sample to listing.

05What to keep from the process

What to keep from the process

Keep the approved drawing, the spec sheet and the sample photos together. That file is what makes a reorder a reorder instead of a new project.

Cut coverage leans on Round at 67%, with the remainder spread across quieter shapes.

06Range snapshot: Buying Guides by the numbe

Range snapshot: Buying Guides by the numbers

Lab grown diamond is the dominant stone at 66%; moissanite makes up 33%.

DimensionReadingBuying note
Designs on file4460Shortlist can come from stock patterns
Dominant metal925 sterling silver (99%)Quote cycle stays short
Dominant stonelab grown diamond (66%)Sourcing already settled
Leading cutRound (67%)Consistent visual language

Lab grown diamond is the dominant stone at 66%; moissanite makes up 33%. Read the snapshot before the shortlist: a category that is narrow in metal but deep in cut behaves differently from one that is the other way round.

07Frequently Asked Questions

Frequently Asked Questions

How long does a custom brief take to prepare?

An hour with the fields above is enough. Most delays come from missing dimensions, not from design debate.

Should the brief include a reference image?

One reference per dimension, clearly labelled as a reference rather than a copy target.

Can the factory change the design during CAD?

They can propose changes, but the priority list decides which proposals are acceptable.

What is the most expensive omission?

Setting height. It is the number that most often forces a rebuild after approval.

Does custom work need a separate MOQ?

Yes. Custom runs are quoted per order and usually carry a higher minimum than stock patterns.

If you want to work from the current range rather than from a catalog PDF, send the two price slots you sell and the size bands you stock. We will reply with the designs that fit, the build on each, and the reorder path. HOLYCOME keeps the full range in one place.

PREPARED BYHOLYCOME production engineering
REVISIONRev. 2026.11
CONTACTRequest drawings

Frequently Asked Questions

How long does a custom brief take to prepare?
An hour with the fields above is enough. Most delays come from missing dimensions, not from design debate.
Should the brief include a reference image?
One reference per dimension, clearly labelled as a reference rather than a copy target.
Can the factory change the design during CAD?
They can propose changes, but the priority list decides which proposals are acceptable.
What is the most expensive omission?
Setting height. It is the number that most often forces a rebuild after approval.
Does custom work need a separate MOQ?
Yes. Custom runs are quoted per order and usually carry a higher minimum than stock patterns.
E

Editorial Team

Senior editor at GemManufacturer, specializing in gemstone identification, jewelry manufacturing, and wholesale sourcing guides.

Looking for Wholesale Jewelry?

Wuzhou HengliLai Jewelry Co., Ltd. - Professional gemstone and jewelry manufacturer in Wuzhou, China. OEM/ODM services, factory-direct pricing, low MOQ.

Contact on WhatsApp service@holycome.com

Wholesale Order Terms

As a factory-direct jewelry manufacturer, we quote every order against stone type, metal, setting and finish. Loose stones are priced per carat, finished rings, earrings and bracelets per piece, and custom metal work per gram. Send your stone, metal, size and quantity for a wholesale price list in USD, quoted with FOB, EXW or DDP shipping terms.

MOQ & Pricing

Minimum order quantity (MOQ) starts from 5 pcs per style. Mixed-SKU orders are accepted, and volume discounts apply from 50 pcs; pricing is tiered by quantity and quoted per piece, per carat or per gram.

Lead Time

Ready-stock pieces ship in 2-5 business days. Custom sampling takes 5-10 days; bulk production lead time runs 10-25 days, depending on design, stone size and order quantity, confirmed in your written quote.

Payment Terms

We accept T/T telegraphic bank transfer, PayPal, Alibaba Trade Assurance and Western Union. OEM and private-label orders require a 30% deposit, with the 70% balance paid before shipment.

Shipping

DHL, FedEx and UPS for samples and small orders; air or sea freight for bulk. Worldwide delivery under FOB, EXW or DDP terms, with QC photos shared before dispatch.

Holycome bench team, Wuzhou.

SGS & CTT tested. GRA card in every box.

QC-checked.