When US buyers source moissanite jewelry from overseas manufacturers, payment terms and deposit structures are among the first practical hurdles to clear. Most established suppliers in this category work on a T/T basis with a 30 percent deposit and the remaining 70 percent balance due before shipment, while sample orders can often run through PayPal.
Understanding how these terms interact with sampling timelines, production schedules, and quality inspection stages helps you plan cash flow, reduce risk, and negotiate from an informed position.
This guide gathers the industry insights that matter most on the payment side of wholesale jewelry buying: what a deposit actually covers, when the balance comes due, how payment milestones align with production stages, and what safeguards you should confirm before releasing final funds.
A deposit is not arbitrary. When you place a bulk order, the manufacturer immediately commits cash to raw materials and labor. In moissanite jewelry, those inputs include 925 sterling silver, 10K/14K/18K solid gold, gold vermeil, or gold plated components, along with loose stones purchased by the carat. The 30 percent deposit covers the supplier's upfront procurement costs and reserves factory capacity for your order.
For buyers, the deposit also serves as a commitment signal. Manufacturers schedule production runs based on confirmed orders, and a paid deposit moves your job into the queue. Without it, your order remains an intention rather than a slot on the production calendar.
The deposit generally funds three things: stone procurement, metal stock, and initial labor allocation. If your order uses stones with GRA or IGI papers, those grading costs come with per-carat pricing that the supplier fronts. Metal pricing fluctuates, so the deposit locks in your position before production begins.
Keep in mind that custom work carries different economics than stock styles. Stock styles have a minimum order quantity of just 1 piece, so a small deposit covers a small commitment. Custom work requires 30 pieces, and the deposit scales accordingly because tooling and material purchasing happen specifically for your design.
Smart buyers map payment milestones to production checkpoints rather than paying on a calendar alone. A typical order follows a clear sequence, and understanding it tells you exactly when your 70 percent balance comes due and what you should verify before paying it.
| Stage | Timeline | Payment Status | Buyer Checkpoint |
|---|---|---|---|
| Sampling | 7 to 10 days | PayPal for samples | Approve sample quality |
| Bulk production | 15 to 25 days | Deposit paid upfront | Request in-process updates |
| Pre-ship QC | Before packing | Balance due before shipment | Review AQL inspection results |
| DDP delivery | 5 to 8 days to US | Fully paid | Confirm receipt and condition |
Reading this table, the key point is that your final payment lands at the pre-shipment point, after quality control has begun and results are available. A supplier who asks for the full balance before pre-ship inspection is out of step with standard practice. Before releasing the 70 percent, ask for the results of the three-stage QC process: incoming material inspection, in-process checks, and the final pre-ship AQL inspection.
Three-stage quality control is your main protection under a balance-before-shipment structure. Incoming inspection verifies that metals and stones match what you ordered, including checking GRA or IGI papers against the stones actually set into your pieces. In-process checks catch setting and plating problems while corrections are still inexpensive. The pre-ship AQL inspection samples finished goods against agreed defect thresholds before anything is packed.
Tie your final payment to documentation, not to a date. Request photos from the AQL inspection, a summary of defects found and reworked, and confirmation that certified stones carry their papers. A supplier confident in its QC will share this without hesitation.
The two payment channels in common use serve different order types, and mixing them up creates friction on both sides. T/T, or telegraphic transfer, is the standard for bulk production orders: a 30 percent deposit at order confirmation and the 70 percent balance before shipment. PayPal is the practical choice for sample orders, where amounts are small and buyers want some recourse while evaluating a new supplier.
Sample orders are low-value by design, since their purpose is to let you judge craftsmanship before committing to bulk. PayPal suits this stage because it is fast, familiar, and gives a buyer a dispute channel if a sample arrives badly damaged or materially different from what was quoted. Sampling takes 7 to 10 days, so you can move quickly from payment to evaluation without waiting on bank processing.
T/T suits bulk orders because production volumes involve sums that make PayPal fees and chargeback exposure unreasonable for either party. The 30/70 structure balances risk: the supplier has enough to buy materials, and you hold back the majority of the payment until goods are finished and inspected. Pricing on bulk orders is quoted per piece for finished jewelry or per carat for loose stones, so confirm which basis applies before you wire the deposit.
Payment terms only work if your cash flow supports them. A single bulk order ties up capital twice: once at deposit and once at balance payment, with roughly 20 to 35 days between the two (15 to 25 days of production plus a few days of inspection and booking). Then DDP delivery to the US adds another 5 to 8 days before inventory is sellable.
Plan for the full cycle from deposit to delivery, not just the deposit. If you reorder on a seasonal calendar, build in a buffer so a delayed balance payment does not push your shipment past a selling window. DDP terms simplify this considerably: the supplier handles duties and shipping into the US, so you face one all-in cost rather than surprise clearance fees that disrupt your landed-cost math.
A short checklist keeps deposit conversations concrete and prevents misunderstandings later:
Each answer should appear in your order confirmation. Verbal assurances about payment timing and quality standards carry little weight once funds move.
Payment terms are also a screening tool. Certain requests signal trouble, while others are simply differences in company size and history that can be worked around.
Be cautious with any supplier who demands 100 percent payment upfront for a bulk production order, refuses to share QC documentation before the balance, or shifts pricing between per piece and per carat after the deposit clears. Also treat vague metal descriptions as a payment issue, not just a product one: if a quote says "gold" without specifying solid gold, vermeil, or plated, you may be paying solid-gold expectations for a plated product.
On the other side, some friction is normal. A new supplier may ask for a slightly higher deposit on a fully custom design because tooling costs are sunk and non-recoverable. You can often offset this by starting with stock styles, where the minimum order quantity of 1 piece lets you test the relationship at low cost through PayPal before moving to T/T bulk terms.
Over a few orders, the deposit structure usually settles into the standard 30/70 split as trust builds.
Another fair accommodation: some buyers request that the balance payment follow, rather than precede, the final AQL report delivery. If a supplier insists balance-before-shipment, that is standard, but receiving the AQL results on the same day keeps both sides honest.
Payment terms do not exist in isolation. They connect to what you buy and who you buy from, and the industry insights above only pay off when applied to real sourcing decisions.
Loose stones sold by the carat carry different payment dynamics than finished jewelry. Certified stones with GRA or IGI papers justify a clean paper trail at every payment stage, since you want the grading documents tied to your specific parcels before the balance clears. Finished pieces in 925 sterling silver with moissanite settings carry lower per-unit value, so larger quantities can move on standard terms with less anxiety per dollar committed.
Custom work at the 30-piece minimum deserves the most careful payment planning of all. You are funding a design that may have resale value only in your channel, so the sample stage becomes even more important: pay for samples through PayPal, take the full 7 to 10 days to evaluate, and only then commit the bulk deposit.
MOQ is 1 piece for stock styles and 30 pieces for custom work, and loose stones are sold by the carat. Sampling takes 7 to 10 days, and bulk production runs 15 to 25 days after the sample is approved. Pricing is quoted per piece or per carat depending on the item. Payment is T/T with a 30% deposit and the 70% balance before shipment, and PayPal is accepted for sample orders.
The standard is T/T with a 30 percent deposit at order confirmation and the 70 percent balance due before shipment. Sample orders are typically paid through PayPal because amounts are small and buyers want a straightforward channel while evaluating a supplier.
PayPal is generally reserved for sample orders. Bulk production involves sums where T/T is more practical for both parties, and the 30/70 deposit structure already limits your exposure before goods are inspected and shipped.
Send it once bulk production is complete and you have reviewed pre-ship AQL inspection results from the supplier's three-stage QC process. Production runs 15 to 25 days after sample approval, and the balance request should come with documentation, not just an invoice.
Under DDP terms, shipping and US duties are handled by the supplier, so your payments are the deposit plus the balance with no surprise clearance costs on arrival. Delivery to the US takes 5 to 8 days after shipment, making your landed cost predictable from the original quote.
The 30 percent percentage typically stays the same, but the absolute amount differs because custom work requires a 30-piece minimum and dedicated materials, while stock styles can start at a 1-piece minimum. Loose stones are priced separately by the carat and should be confirmed in the same order confirmation.
Payment terms reward buyers who sequence their commitments sensibly: pay for samples through PayPal, evaluate them against a written specification, then commit a 30 percent deposit to bulk production with the balance tied to pre-ship AQL results and DDP delivery terms. That sequence keeps your capital exposed in small steps and gives every payment a verifiable milestone behind it.
If you are ready to test this process, browse the available styles and loose stones in the wholesale jewelry catalog to see product and pricing options before any commitment. To understand who handles your order, from QC stages to shipping, read about the company on the manufacturer profile page.
When you want a quote with deposit terms, sampling timelines, and DDP shipping spelled out in writing, send your requirements through the wholesale inquiry contact page and start with a sample order.
Moissanite is a lab-created diamond alternative, not a natural diamond; listings and customer-facing copy should describe it that way.
Sources: Grading references: GIA gem education and GIA laboratory information.
Wuzhou HengliLai Jewelry Co., Ltd. - Professional gemstone and jewelry manufacturer in Wuzhou, China. OEM/ODM services, factory-direct pricing, low MOQ.
Contact on WhatsApp service@holycome.comAs a factory-direct jewelry manufacturer, we quote every order against stone type, metal, setting and finish. Loose stones are priced per carat, finished rings, earrings and bracelets per piece, and custom metal work per gram. Send your stone, metal, size and quantity for a wholesale price list in USD, quoted with FOB, EXW or DDP shipping terms.
Minimum order quantity (MOQ) starts from 5 pcs per style. Mixed-SKU orders are accepted, and volume discounts apply from 50 pcs; pricing is tiered by quantity and quoted per piece, per carat or per gram.
Ready-stock pieces ship in 2-5 business days. Custom sampling takes 5-10 days; bulk production lead time runs 10-25 days, depending on design, stone size and order quantity, confirmed in your written quote.
We accept T/T telegraphic bank transfer, PayPal, Alibaba Trade Assurance and Western Union. OEM and private-label orders require a 30% deposit, with the 70% balance paid before shipment.
DHL, FedEx and UPS for samples and small orders; air or sea freight for bulk. Worldwide delivery under FOB, EXW or DDP terms, with QC photos shared before dispatch.
Holycome bench team, Wuzhou.
SGS & CTT tested. GRA card in every box.
QC-checked.