Metal Guide

Metal Guide Wholesale: First-Order Landed Cost Math

Metal Guide Wholesale: First-Order Landed Cost Math
TECHNICAL NOTEPART 54A1EA4ENov 18, 20267 MIN READ
Scope
01Why the First Quote Is Almost Never the La

Why the First Quote Is Almost Never the Landed Cost

Every week a buyer sends me a competitor's quote and asks why our unit price is higher. Nine times out of ten, the other quote stops at the factory door. It has no freight, no duty, no certificate cost, no payment fees. The buyer is comparing a sticker to a total.

I have spent twelve years on the QC floor at HOLYCOME, checking stones, weighing metal, and signing off pre-ship inspections. This piece is the cost math I walk buyers through before their first order, so nobody gets surprised at customs.

One number up front: our cost, speed and yield run roughly 20% better than a typical trading company. The reason is boring. We are the factory. There is no middle layer adding margin and no extra handoff adding days. You pay for metal, stones, labor and freight, not for a reseller's office.

02The Five Cost Buckets on Every Wholesale O

The Five Cost Buckets on Every Wholesale Order

Break any jewelry quote into these five buckets and the fog clears. If a supplier cannot show you all five, ask why.

  • Metal cost: the raw silver or gold weight, priced off spot plus a fabrication premium.
  • Stone cost: moissanite, lab-grown diamond, or CZ, priced per carat by size and grade.
  • Labor and finishing: casting, setting, polishing, plating, and QC time.
  • Certificates and packaging: GRA and IGI paperwork, boxes, pouches, labels.
  • Landed costs: freight, insurance, duty, payment fees, and any inspection charges.

Most first-time buyers only see the first three. The last two decide whether the order actually makes money.

03Metal Cost: Spot Price Is Only the Startin

Metal Cost: Spot Price Is Only the Starting Line

Silver and gold move daily, so a quote is only valid for a short window. A supplier who locks a price for 30 days is either hedging or building in a cushion. Ask which.

For 925 silver, the metal cost is the piece weight times the spot price per gram, plus a fabrication premium that covers loss, solder, and finishing. That premium is where factories differ. A trading company often adds 15 to 25% on top of the factory premium simply because it can.

For gold, the same math applies but the stakes are higher. A 14K piece contains 58.5% fine gold, so you pay for the alloy weight, not the finished weight. If a supplier quotes gold by finished weight without stating purity and alloy loss, the number is not comparable.

Cost lineWhat it coversTypical share of unit costWatch for
MetalSilver or gold weight plus fabrication premium25 to 45%Premium stacked by a middleman
StonesMoissanite or lab-grown diamond per carat20 to 40%Grade and size not stated
LaborCasting, setting, polishing, plating15 to 25%Hand-set vs. machine-set
CertificatesGRA and IGI paperwork3 to 8%Certificate body not named
LandedFreight, duty, payment fees8 to 18%DDP not quoted upfront
04Stone Cost: Where Grade Language Hides Mon

Stone Cost: Where Grade Language Hides Money

Moissanite is graded by color and clarity, and the price gap between grades is real. A D-color VVS stone and an I-color VS stone can differ by 30% or more per carat. If a quote just says "moissanite," you cannot compare it to anything.

Lab-grown diamonds add another layer: certificate body matters. IGI is the standard most US and EU buyers ask for. GRA is common for moissanite. Ask which lab, which report number, and whether the certificate travels with the piece or is batch-issued.

Our incoming stone check is the first of three QC stages. Every parcel is checked for color, clarity, and carat weight before it touches a setting. Stones that fail go back to the supplier, not into your order. That single step is why our yield on setting runs better than a trading company that never sees the stones.

05Labor, Certificates, and the 20% Differenc

Labor, Certificates, and the 20% Difference

Labor is the bucket buyers underestimate most. A hand-set pavé band takes several times the bench time of a plain band. Machine setting is faster and cheaper but has a different look and a different failure rate. Ask which method the quote assumes.

Certificates are not free. GRA and IGI both charge per piece, and the cost scales with the report type. A batch certificate is cheaper but less useful for retail resale. A per-piece certificate costs more but supports a higher retail price.

Here is where the 20% shows up. A trading company buys from a factory, adds margin, and often pays for a second round of handling and re-inspection. We cast, set, polish, and inspect under one roof. Fewer handoffs mean less loss, faster turnaround, and a lower total. That is the whole trick.

If a supplier cannot tell you the metal weight, the stone grade, and the certificate body in the same email, the quote is a guess, not a price.
06Landed Cost Math: A Worked First Order

Landed Cost Math: A Worked First Order

Say you order 200 pieces of a 925 silver moissanite pendant. The factory unit price is 18 USD. That is not your cost.

Add freight. DDP delivery to a US address runs 5 to 8 days and is quoted upfront, so there is no surprise at customs. Add payment fees: T/T 30% deposit is standard, and PayPal is available for samples, each with its own fee. Add duty and any inspection charges. On a 3,600 USD order, landed costs commonly add 8 to 18%, so budget 3,900 to 4,250 USD all-in.

Now the yield side. If 5% of pieces fail pre-ship AQL and get replaced before shipping, you avoid the cost of returns and chargebacks later. That replacement is built into our process, not billed as a favor. A trading company that skips pre-ship inspection ships the failures and lets you find them.

Run the same math on a custom order. MOQ is 30 pcs for custom designs, and production runs 12 to 18 days. Stock items ship from 1 pc. The 12 to 18 days is real bench time, not a queue placeholder, because the same floor that casts also inspects.

07Payment, MOQ, and Lead Time in Plain Terms

Payment, MOQ, and Lead Time in Plain Terms

Payment terms are simple. T/T with 30% deposit to start, balance before shipment. PayPal for samples so you can test quality without a wire. We do not ask for full payment upfront on a first order.

MOQ is 1 pc for stock and 30 pcs for custom. That split matters on a first order because you can mix stock pieces to test the market before committing to a custom run.

Lead time is 12 to 18 days for production, plus 5 to 8 days DDP delivery. Add a few days for certificate issuance if you need per-piece IGI reports. Plan the first order around six weeks door to door and you will not be chasing a deadline.

08Frequently Asked Questions

Frequently Asked Questions

What is the MOQ for a first wholesale order?

Stock items start at 1 pc, and custom designs start at 30 pcs. Most first orders mix stock pieces to test demand before committing to a custom run. Lead time is 12 to 18 days for production.

How is the price basis calculated?

Price is metal weight at spot plus fabrication premium, stone cost per carat by grade, labor, and certificate cost. Landed costs such as freight and duty are quoted separately so you see the full number. T/T 30% deposit is standard, and PayPal is available for samples.

Do you provide certificates and DDP delivery?

Yes. GRA and IGI certificates are available depending on the stone and report type. DDP delivery runs 5 to 8 days to US and EU addresses, with duty handled upfront so there is no customs surprise.

09Get the Real Number Before You Commit

Get the Real Number Before You Commit

Send me your design, target quantity, and destination country, and I will send back a line-by-line landed cost, not a single unit price. If you want to test quality first, ask for samples and we will quote PayPal terms. Reach the floor directly at WhatsApp +86 133 7744 7107 or service@holycome.com.

PREPARED BYHOLYCOME production engineering
REVISIONRev. 2026.11
CONTACTRequest drawings
S

Sarah Lin

GIA Graduate Gemologist (G.G.) with ten years of experience in gem identification and colored-stone grading, having examined over 10,000 stones.

Looking for Wholesale Jewelry?

Wuzhou HengliLai Jewelry Co., Ltd. - Professional gemstone and jewelry manufacturer in Wuzhou, China. OEM/ODM services, factory-direct pricing, low MOQ.

Contact on WhatsApp service@holycome.com

Wholesale Order Terms

As a factory-direct jewelry manufacturer, we quote every order against stone type, metal, setting and finish. Loose stones are priced per carat, finished rings, earrings and bracelets per piece, and custom metal work per gram. Send your stone, metal, size and quantity for a wholesale price list in USD, quoted with FOB, EXW or DDP shipping terms.

MOQ & Pricing

Minimum order quantity (MOQ) starts from 5 pcs per style. Mixed-SKU orders are accepted, and volume discounts apply from 50 pcs; pricing is tiered by quantity and quoted per piece, per carat or per gram.

Lead Time

Ready-stock pieces ship in 2-5 business days. Custom sampling takes 5-10 days; bulk production lead time runs 10-25 days, depending on design, stone size and order quantity, confirmed in your written quote.

Payment Terms

We accept T/T telegraphic bank transfer, PayPal, Alibaba Trade Assurance and Western Union. OEM and private-label orders require a 30% deposit, with the 70% balance paid before shipment.

Shipping

DHL, FedEx and UPS for samples and small orders; air or sea freight for bulk. Worldwide delivery under FOB, EXW or DDP terms, with QC photos shared before dispatch.

Holycome bench team, Wuzhou.

SGS & CTT tested. GRA card in every box.

QC-checked.