If you are sourcing jewelry for a US retail program, the metal you choose shapes both your product cost and your calendar. This Metal Guide focuses on the practical question wholesale buyers ask most: how long will it take to move from a sample to shelf-ready bulk inventory? The short answer is 7 to 10 days for sampling and 15 to 25 days for bulk production after approval, with DDP delivery to the US adding 5 to 8 days.
The sections below break down how each metal choice affects that timeline and what you can do to keep your program on schedule.
Every metal carries its own sourcing and manufacturing steps, and each step adds time before your order reaches the production floor. 925 sterling silver moves fastest because the material is widely available and fabrication is straightforward. 10K, 14K, and 18K solid gold require metal procurement and casting runs that can stretch lead times, especially during high-demand seasons. Gold vermeil and gold plated pieces add plating as a distinct stage after base fabrication, which extends both sampling and bulk schedules.
Stones introduce a second layer of scheduling. Loose stones are sold by the carat, and graded stones ship with GRA or IGI papers. If your sample requires specific graded stones, sourcing them can add days to the sampling window. Moissanite, a lab-created diamond alternative, is typically available faster than rare graded naturals, which makes it a practical choice for buyers working against a launch date.
Sampling is where your Metal Guide decisions get tested in the real world. Our sampling lead time is 7 to 10 days, and that window covers design confirmation, material preparation, fabrication, and finishing. Sample orders can be paid through PayPal, which keeps the process fast and low-commitment for new buyers testing a style before bulk.
A sample approved in writing becomes your production reference. When the bulk run begins, the factory works from that approved sample rather than interpreting a spec sheet. Skipping or rushing sampling is the most common cause of extended bulk lead times, because corrections discovered mid-production can push a 15 to 25 day run well past its window. Buyers who treat sampling as a mandatory gate consistently see smoother bulk schedules.
Once you approve a sample, bulk production runs 15 to 25 days after approval. Stock styles carry a minimum order quantity of 1 piece, which makes reordering simple. Custom work requires a minimum of 30 pieces, and custom orders should budget the full production window plus approval time. Pricing is quoted per piece or per carat depending on the item, so gold and stone-heavy styles are quoted on a different basis than simple silver bands.
Bulk production moves through casting or fabrication, stone setting, plating where applicable, and polishing. Solid gold orders in 10K, 14K, or 18K depend on casting schedules, and complex custom designs may run toward the longer end of the range. Gold plated and vermeil orders add a plating cycle after the base metal work is complete. Building these stages into your purchasing calendar, rather than expecting a compressed run, keeps retail delivery dates realistic.
Bulk orders use T/T payment with a 30 percent deposit and a 70 percent balance before shipment. Production starts once the deposit clears, and goods ship once the balance is settled. Buyers who align internal payment approvals with these milestones avoid dead days between deposit and production start, which is often where timelines slip silently.
Every order passes a three-stage quality control process: incoming material inspection, in-process checks during fabrication, and a pre-ship AQL inspection. The pre-ship AQL inspection is your safeguard against receiving a bulk run that does not match the approved sample. Because this stage happens before shipment, buyers should confirm goods are AQL-passed before releasing the 70 percent balance.
Metal-specific checks at this stage include plating adhesion on vermeil and gold plated items and hallmark accuracy on 925 sterling silver and solid gold pieces.
The table below summarizes how common metal choices differ across the factors that influence your total timeline from sample approval to US delivery.
| Metal | Material Availability | Extra Production Steps | Timeline Impact |
|---|---|---|---|
| 925 sterling silver | Widely available | Polish and finish | Fastest sampling and bulk |
| 10K/14K/18K solid gold | Casting schedule dependent | Casting and hallmarking | Longer end of range |
| Gold vermeil | Silver base plus gold | Plating cycle added | Added days for plating |
| Gold plated | Base metal readily available | Plating cycle added | Added days for plating |
Use this comparison to match metal selection with your launch calendar. If a hard retail date is fixed, silver-based styles and moissanite settings give you the most schedule flexibility. If your program can absorb a longer window, solid gold and graded-stone designs offer material value that justifies the extended run.
After production and pre-ship inspection, DDP delivery to the US takes 5 to 8 days. DDP means duties and shipping are handled before the goods reach you, so there is no customs delay on your side. Adding this to your planning gives a realistic total: roughly 7 to 10 days for sampling, 15 to 25 days for bulk, and 5 to 8 days for delivery.
A buyer starting from scratch should plan for approximately four to six weeks from first sample request to US warehouse receipt for a custom program, and less for stock styles reordered at 1 piece minimum.
For ongoing wholesale programs, map reorder triggers against the bulk window. If your retail location sells through a style in six weeks, place the reorder when roughly three weeks of stock remain. This buffer covers the 15 to 25 day production run plus 5 to 8 days DDP transit without gap weeks on your shelf.
Custom work requires 30 pieces, so test demand through samples before committing. Because samples take 7 to 10 days and PayPal keeps that stage simple, you can validate a design with minimal exposure, then commit the 30 piece minimum with a clear schedule and the 30/70 T/T structure already planned.
MOQ is 1 piece for stock styles and 30 pieces for custom work, and loose stones are sold by the carat. Sampling takes 7 to 10 days, and bulk production runs 15 to 25 days after the sample is approved. Pricing is quoted per piece or per carat depending on the item. Payment is T/T with a 30% deposit and the 70% balance before shipment, and PayPal is accepted for sample orders.
Sampling takes 7 to 10 days, bulk production takes 15 to 25 days after sample approval, and DDP delivery to the US takes 5 to 8 days. A complete custom program typically runs four to six weeks end to end. Stock styles move faster because the sample stage can be shortened or skipped.
Yes. Stock styles carry a minimum order quantity of 1 piece, so you can purchase a sample directly and pay through PayPal. Custom work requires 30 pieces, which is why sampling that design first is the recommended path.
925 sterling silver styles generally sit at the faster end of both sampling and bulk ranges. Solid gold in 10K, 14K, or 18K depends on casting schedules and may run toward the longer end. Gold vermeil and gold plated items add a plating cycle after base fabrication, extending the timeline slightly.
Sample orders are paid through PayPal, keeping the testing stage quick. Bulk orders use T/T with a 30 percent deposit to start production and a 70 percent balance before shipment. Plan your internal approvals around these two milestones to avoid delays.
Loose stones are sold by the carat, and pricing is per piece or per carat depending on the item. Graded stones include GRA or IGI papers. Moissanite, a lab-created diamond alternative, is also available for buyers seeking a diamond-look option with different material economics.
The fastest way to test this Metal Guide framework against your own program is to request samples of the styles you are considering. Browse the catalog to identify candidate styles, review the company background to understand who will be producing your order, and reach out through the contact page to confirm lead times for your specific metal and stone combination.
Sampling in 7 to 10 days with PayPal payment makes it easy to validate before you commit to the 15 to 25 day bulk run.
Visit our product catalog to review available styles and metal options, learn more on our company profile, and start the conversation through our contact page to get a sampling schedule for your first order.
Sources: Grading references: GIA gem education and GIA laboratory information.
Wuzhou HengliLai Jewelry Co., Ltd. - Professional gemstone and jewelry manufacturer in Wuzhou, China. OEM/ODM services, factory-direct pricing, low MOQ.
Contact on WhatsApp service@holycome.comAs a factory-direct jewelry manufacturer, we quote every order against stone type, metal, setting and finish. Loose stones are priced per carat, finished rings, earrings and bracelets per piece, and custom metal work per gram. Send your stone, metal, size and quantity for a wholesale price list in USD, quoted with FOB, EXW or DDP shipping terms.
Minimum order quantity (MOQ) starts from 5 pcs per style. Mixed-SKU orders are accepted, and volume discounts apply from 50 pcs; pricing is tiered by quantity and quoted per piece, per carat or per gram.
Ready-stock pieces ship in 2-5 business days. Custom sampling takes 5-10 days; bulk production lead time runs 10-25 days, depending on design, stone size and order quantity, confirmed in your written quote.
We accept T/T telegraphic bank transfer, PayPal, Alibaba Trade Assurance and Western Union. OEM and private-label orders require a 30% deposit, with the 70% balance paid before shipment.
DHL, FedEx and UPS for samples and small orders; air or sea freight for bulk. Worldwide delivery under FOB, EXW or DDP terms, with QC photos shared before dispatch.
Holycome bench team, Wuzhou.
SGS & CTT tested. GRA card in every box.
QC-checked.