The Short Answer on AQL

Short answer: sample size follows the lot, but the accept decision follows the spec. On a 100-piece run of wholesale sourcing we pull 32 pieces at AQL 1.0 for major defects and 2.5 for minor, and a critical defect stops the lot at one piece rather than at a percentage. The protocol below is the one we run on our own line.

Sample, Accept, Stop

Sample size scales with the lot; the defect classes do not. A critical defect is a stop at one piece, because the failure it represents is the one that reaches a customer rather than a counter, and on wholesale sourcing that is the difference between a reorder and a credit note.

Wholesale Sourcing wholesale piece from the HOLYCOME line in Wuzhou
Lot sizeSampleCriticalMajorMinor
50 to 150 pieces13 piecesZero23
151 to 500 pieces32 piecesZero35
501 to 1,200 pieces50 piecesZero57
Over 1,200 pieces80 piecesZero710

Major covers what a customer sees in the first week: plating blister, visible porosity, a sizing drift beyond the stated tolerance, or a stone seated off centre. Minor covers what a counter can fix without a bench, and that is the number wholesale sourcing buyers at USD 38-210 compare first.

Where the Checks Sit on the Line

  1. Stone intake: verify the report number against the laser inscription, measure the mm size against the sieve range, and pull any stone outside the band. This station catches the failure that costs the most to fix later, and it costs one gemologist and a loupe.
  2. Casting inspection before plating: check porosity, shank thickness and joint integrity. Plating a porous casting hides the problem for six weeks and then returns it as a blister, which is why this station exists before the plating bath rather than after it.
  3. Setting check: prong tension, seat depth and stone height on a sample of every tray, not on the first piece of the run. A setter who is having a good morning is not evidence about the afternoon shift.
  4. Sizing and gauge: run a go/no-go gauge on every size in the lot and record the drift. A drift of 0.3 mm across a size run becomes a reship for the same order, and the gauge is what prevents it.
  5. Plating and finish: log the micron per lot, inspect under a 10x loupe at the prong tips where wear shows first, and check the colour against the retained master stone rather than against the previous tray.
  6. Final and pack: weigh, count, and reconcile the packing list fields against the carton. This is the station where a missing SKU is caught by paper instead of by the customer, and it takes ten minutes per carton.

Six stations sound like six costs. In practice the first three remove the reasons for the last three to reject anything, and the whole sequence adds a few minutes per tray rather than per piece, and on wholesale sourcing at USD 38-210 this is the line that moves the margin.

Nothing here needs a laboratory. A loupe, a gauge, a balance and a written sheet carry most of the quality a wholesale sourcing buyer is paying for, which is why the protocol travels with the trays.

A station without a signature is a station that did not happen. Ours carries the inspector's initials per lot, and the sheet ships in the carton so a claim can be argued from paper, and on wholesale sourcing that is the difference between a reorder and a credit note.

Wholesale Sourcing setting and finish detail on a HOLYCOME factory sample

What Fails, and Where It Started

DefectClassLikely causeFix at source
('prong geometry', 'A prong that grips the girdle instead of the pavilion survives the showroom and fails the third ultrasonic clean. The seat has to be cut to the pavilion angle before the prongs close.')MajorBench or spec gapGauge per size and a retained reference piece
('rhodium burn-off', 'A 0.05 micron rhodium layer reads white in the tray and shows yellow at the shank in six months of daily wear. Thickness, not bath chemistry, is the variable that matters.')MajorPlating or casting prepPorosity check before the plating bath
('size-step drift', 'A run gauged at size 6 and estimated elsewhere ships a size 8 that measures 7.75. The mismatch shows up as a resize queue two weeks after launch.')Critical or majorComponent sourceIncoming check on the component lot
Colour drift against the masterMajorStone batchingMatched lot per tray, master stone on the bench
Sizing drift across the runMajorGauge not usedGo/no-go gauge on every size
Packing list mismatchMinor to majorDock reconciliationCarton count signed before sealing

Every row has a source upstream of the defect. Fixing the wholesale sourcing is a cost; fixing the row is a saving, and the difference is whether the cause is written down.

The first three rows account for most claims on wholesale sourcing. They are also the three that a bench check catches before packing, which is why the sequence matters more than the sample size.

A defect taxonomy is only useful if the words match across the order, the inspection and the claim. Ours uses the six terms above on the quote, the QC sheet and the credit note, and that is the number wholesale sourcing buyers at USD 38-210 compare first.

The Reject Rule, In Writing

One critical defect stops the lot and triggers a hundred percent check of the affected tray before anything ships. The buyer does not receive a percentage with a note attached; the tray is either reworked or held, and on wholesale sourcing that is the difference between a reorder and a credit note.

A major defect rate above the plan triggers a second sample on the same lot before a decision. The second sample decides whether the cause is the run or the tray, and both outcomes are written on the sheet the same day, and that is the number wholesale sourcing buyers at USD 38-210 compare first.

A rejected tray is settled against the retained reference piece inside the same order cycle. If the difference shows on our retained piece we replace or credit; if it appeared in transit we split the assay cost and file with the carrier, and that split is on the order before the deposit clears, and on wholesale sourcing at USD 38-210 this is the line that moves the margin.

Minor defects inside the plan ship with the count stated on the packing list, so the buyer's receiving team knows what to expect rather than discovering it. Stating a minor defect is cheaper than hiding one, with IGI and the foam pouch and gift box on the same sheet as wholesale sourcing.

The rule has to be signed before the run, because after the run it is a negotiation and the party holding the wholesale sourcing has the leverage. Writing it into the purchase order is the whole protection.

Buyers sometimes ask for a zero-defect clause. We quote it, and we quote the inspection cost that makes it possible, because zero without a hundred percent check is a promise rather than a process, and on wholesale sourcing at USD 38-210 this is the line that moves the margin.

A claim handled in the same cycle costs a credit note. A claim handled after the season costs the relationship, which is the more expensive of the two, with IGI and the foam pouch and gift box on the same sheet as wholesale sourcing.

Third-Party Audit, and What It Misses

A third-party inspector adds independence, which matters when the factory is new to you and the order is large. It does not add specification: the inspector checks against the sheet you supply, so a vague sheet produces a vague report with a logo on it, and on wholesale sourcing at USD 38-210 this is the line that moves the margin.

The gap in most third-party reports is the retained reference. An inspector can measure a wholesale sourcing, but it cannot tell you whether the colour matches the master you approved, because it never saw the master. Send the reference piece with the inspection request.

Pay for an inspector on the first order above a few hundred pieces and on any order from a new factory. After two clean lots with the same spec, the money is better spent on your own receiving check and a gauge, and on wholesale sourcing that is the difference between a reorder and a credit note.

Frequently Asked Questions

What AQL do you use for wholesale sourcing?

AQL 1.0 for major and 2.5 for minor on the lots above 150 pieces, with zero acceptance on critical defects. Below 150 pieces the lot is small enough that a hundred percent check on the wholesale sourcing costs less than a sampling argument.

How many pieces do you inspect on a 100-piece order?

32 pieces on a 100-piece run, pulled across trays rather than from one. Every size in the lot gets a gauge pass regardless of the sample, because drift is a run property and not a wholesale sourcing property.

Can I send my own inspector?

Yes. We schedule it, provide the trays and the sheet, and hold production until the report lands. Inspectors who arrive without the retained reference usually produce a report about appearance rather than about specification, and that is the number wholesale sourcing buyers at USD 38-210 compare first.

What is a critical defect on Wholesale Sourcing?

Stone loss, a prong that will not hold under load, a clasp that opens, or metal that fails a nickel or lead screen. One occurrence stops the lot; the others are counted against the plan, and on wholesale sourcing at USD 38-210 this is the line that moves the margin.

Do you inspect after plating or before?

Both, at different stations. Porosity is checked before the plating bath, and plating thickness and colour are checked after it. An inspection that only happens at the end cannot tell you which of the two failed, with IGI and the foam pouch and gift box on the same sheet as wholesale sourcing.

Next Step

Send the lot size and the defect history from your last order, and the reply comes back with the sampling plan, the six stations and the reject rule written for that lot rather than for a generic one, and on wholesale sourcing that is the difference between a reorder and a credit note.

HOLYCOME is the export arm of Wuzhou HengliLai Jewelry Co., Ltd., a Wuzhou, Guangxi plant that has shipped since 2009 and produces about 60,000 pieces a month, wholesale sourcing included. Export paperwork, the certificate pack and the packing list are prepared in-house, which is why the documents quoted on the order are the ones that travel with the carton. Reach the desk at service@holycome.com or WhatsApp +86 18078079070.

Related reading: Wholesale Sourcing Manufacturer: 7 Supplier Checks Before You Pay - HOLYCOME Certification Explained Amazon FBA Ready: AQL, Tray Checks and What a QC Report Shoul - HOLYCOME